Analysis Of Turnaround Time Delays In C-Check Of Airbus 330 Aircraft Using Root Cause Analysis Method
Abstract
Keywords
Full Text:
PDFReferences
J. Indriani, M. Lestari, N. Novrikasari, and R. F. Nandini, “Analisis Penyebab Kejadian Kecelakaan Pesawat di Indonesia dengan Pendekatan the Shell Model,” War. Penelit. Perhub., vol. 35, no. 1, pp. 17–28, 2023, doi: 10.25104/warlit.v35i1.2064.
Directorate General of Civil Aviation, “Jumlah Penumpang Lalu Lintas Angkutan Udara.”
E. S. Agustian, “Kajian Maintenance Pesawat Penumpang Di Indonesia,” J. Tek. SILITEK, vol. 3, no. 01, pp. 43–49, 2023, doi: 10.51135/jts.v3i01.61.
D. L. Trenggonowati, A. Umyati, R. Patradhiani, A. Sonda, and F. P. Sari, “Analisis Penerapan Lean Six Sigma untuk Mengurangi Turn Around Time (TAT) C-CHECK pada Jasa Perawatan Pesawat,” Integr. J. Ilm. Tek. Ind., vol. 6, no. 2, p. 70, 2021, doi: 10.32502/js.v6i2.3989.
P. Andrade, C. Silva, B. Ribeiro, and B. F. Santos, “Aircraft maintenance check scheduling using reinforcement learning,” Aerospace, vol. 8, no. 4, pp. 1–18, 2021, doi: 10.3390/aerospace8040113.
Q. Deng, B. F. Santos, and R. Curran, “A practical dynamic programming based methodology for aircraft maintenance check scheduling optimization,” Eur. J. Oper. Res., vol. 281, no. 2, pp. 256–273, 2020, doi: 10.1016/j.ejor.2019.08.025.
E. Y. Ayu Martina, Edy Suwondo, “Analisis Keterlambatan Penyelesaian C-Check (Studi Kasus: Perawatan Boeing 737NG di PT XYZ),” Teknol. Kedirgant., vol. 8, no. 1, p. 89, 2023, [Online]. Available: http://www.nber.org/papers/w16019
N. Susanto and D. Azis, “Analisis Turn Around Time (Tat) Pada Proses Pooling Komponen Pesawat: Studi Kasus Keterlambatan Pengembalian Komponen Pesawat Crj 1000 Nextgen Di Pt. Gaa,” J@Ti Undip J. Tek. Ind., vol. 11, no. 1, 2016, doi: 10.12777/jati.11.1.21-26.
A. R. Idhartono, “Studi Literatur : Analisis Pembelajaran Daring Anak Berkebutuhan Khusus di Masa Pandemi,” J. Stud. Guru dan Pembelajaran, vol. 3, no. 3, pp. 529–533, 2020, doi: 10.30605/jsgp.3.3.2020.541.
Sugiyono, Metode Penelitian Kuantitatif, Kualitatif dan R&D. Alfabeta, 2022.
S. Tinggi et al., “Analisis Beban Kerja Karyawan Dengan Pendekatan Metode Root Case Analysis ( Rca ) Fishbone Pada Pt . Jasa Peralatan Pelabuhan,” vol. 2, no. September, pp. 24–32, 2023.
T. Wagner, “Improving Environmental Problem Definitions Using Root Cause Analysis,” no. September, 2022.
N. Susendi, A. Suparman, and I. Sopyan, “Kajian Metode Root Cause Analysis yang Digunakan dalam Manajemen Risiko di Industri Farmasi,” Maj. Farmasetika, vol. 6, no. 4, p. 310, 2021, doi: 10.24198/mfarmasetika.v6i4.35053.
N. Hairiyah, R. R. Amalia, and E. Luliyanti, “Analisis Statistical Quality Control (SQC) pada Produksi Roti di Aremania Bakery,” Ind. J. Teknol. dan Manaj. Agroindustri, vol. 8, no. 1, pp. 41–48, 2019, doi: 10.21776/ub.industria.2019.008.01.5.
R. Kent, “Quality Management in Plastics Processing,” 2016, [Online]. Available: ttps://doi.org/10.1016/b978%0A0-08-102082-1.50007-1
M. I. Monoarfa, Y. Hariyanto, and A. Rasyid, “Analisis Penyebab bottleneck pada Aliran Produksi briquette charcoal dengan Menggunakan Diagram fishbone di PT. Saraswati Coconut Product,” Jambura Ind. Rev., vol. 1, no. 1, pp. 15–21, 2021, doi: 10.37905/jirev.1.1.15-21.
A. Rahmana and A. Herdiansyah, “Perbaikan Kualitas Sepatu Dengan Metode Five Whys Analysis Dan Failure Mode and Effect Analysis ( FMEA ) Di PT Primarindo Asia Infrastructure Tbk,” Prof. Akuntan Menuju Sustain. Bus. Pract., pp. 1075–1082, 2017.
A. Danastiningrum and M. I. Akbar, “Usulan Perbaikan Tingkat Kepuasan Kerja Karyawan Divisi HCGS & SHE dengan Metode 5W1H di PT Kalimantan Prima Persada,” J. Rekayasa dan Optimasi Sist. Ind., vol. 01, no. 1, pp. 25–31, 2019.
DOI: http://dx.doi.org/10.52155/ijpsat.v48.2.6887
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 Lilies Esthi Riyanti

This work is licensed under a Creative Commons Attribution 4.0 International License.

















