The Effects of Schedule-Driven Project Management in Multi-Project Environments
Abstract
Keywords
Full Text:
PDFReferences
Abdel-Hamid, T.K., 1988. Understanding the 90% syndrome in software project management: a simulation case study. The Journal of Systems and Software 8, 109–119.
Abdel-Hamid, T.K., Madnick, S.E., 1991. Software Project Dynamics: An Integrated Approach. Prentice Hall, USA.
Aritua, B., Smith, N.J., Bower, D., 2009. Construction Client Multi-Projects— A Complex Adaptive Systems Perspective. International Journal of Project Management 27, 72–79.
Biernacki, P., Waldorf, D., 1981. Snowball sampling: problems and techniques of chain referral sampling. Sociological Methods & Research 10, 141–163.
Blichfeldt, B.S., Eskerod, P., 2008. Project portfolio management — there's more to it than what management enacts. International Journal of Project Management 26 (4), 357–365.
Brooks, F.P., 1995. The Mythical Man-Month: Essays on Software Engineering. Addison-Wesley Professional.
Calantone, R.J., Benedetto, C.A.D., 2000. Performance and time to market: accelerating cycle time with overlapping stages. IEEE Transactions on Engineering Management 47 (2), 232–243.
Canonico, P., Söderlund, J., 2010. Getting control of multi-project organizations: combining contingent control mechanisms. International Journal of Project Management 28, 796–806.
Cooper, R.G., 1990. Stage-gate systems: a new tool for managing new products. Business Horizons 44–54 May–June.
Cooper, R.G., Edgett, S.J., Kleinschmidt, E.J., 1997. Portfolio management in new product development: lessons from the leaders — II. Research Technology Management 40 (6), 43–52.
Crawford, C.M., 1992. The hidden costs of accelerated product development. Journal of Product Innovation Management 9, 188–199.
Cusumano, A., Nobeoka, K., 1998. Thinking Beyond Lean: How Multi-project Management is Transforming Product Development at Toyota and Other Companies. Free Press, New York.
De Neufville, R., Scholtes, S., 2011. Flexibility in Design. The MIT press. Dooley, L., Lupton, G., O'Sullivan, D., 2005. Multiple project management: a modern competitive necessity. Journal of Manufacturing Technology and Management 16 (5), 466–482.
Eisenhardt, K.M., Tabrizi, B.N., 1995. Accelerating adaptive processes: product development in the global computer industry. Administrative Science Quarterly 40, 84–110.
Elonen, S., Artto, K.A., 2003. Problems in managing internal development projects in multi-project environments. International Journal of Project Management 21 (6), 395–402.
Engwall, M., Jerbrant, A., 2003. The resource allocation syndrome: the prime challenge of multi-project. International Journal of Project Management 21, 403–409.
Ford, N.D., Sterman, J., 2003. The liar's club: concealing rework in concurrent development. Concurrent Engineering 11 (3), 211–219.
Forrester, J.W., 1961. Industrial Dynamics. MIT Press, Cambridge, Massachusetts.
Forrester, J.W., 1968. Industrial dynamics—after the first decade. Management Science 14 (7), 398–415.
Fricke, S.E., Shenhar, A.J., 2000. Managing multiple engineering projects in a manufacturing support environment. IEEE Transactions on Engineering Management 47 (2), 258–268.
Geraldi, J.G., 2008. The balance between order and chaos in multi-project firms: a conceptual model. International Journal of Project Management 26 (4), 348–356.
Griffin, A., 1997. PDMA research on new product practices: updating trends, and benchmarking best practices. Journal of Product Innovation Management 14, 429–458.
Jonas, D., 2010. Empowering portfolio managers: how management involvement impacts project portfolio management performance. International Journal of Project Management 28, 818–831.
Karasek, R., Theorell, T., 1990. Healthy Work. Basic Books, New York.
Kaulio, M.A., 2008. Project leadership in multi-project settings: findings from a critical incident study. International Journal of Project Management 26, 338–347.
Kavadias, S., Loch, C.H., 2003. Optimal project sequencing with recourse as a scarce resource. Production and Operations Management 12 (4), 433–444.
Kuprenas, J.A., 2003. Implementation and performance of a matrix organization structure. International Journal of Project Management 21 (1), 51–62.
Kurtulus, I., Davis, E.W., 1982. Multi-project scheduling: categorization of heuristic rules performance. Management Science 28 (2), 161–172.
Laslo, Z., Goldberg, A.I., 2008. Resource allocation under uncertainty in a multi-project matrix environment: is organizational conflict inevitable? International Journal of Project Management 26, 773–788.
Lieberman, M.B., Montgomery, D.B., 1988. First-mover advantages. Strategic Management Journal 9 (1), 41–58.
Lyneis, J., Cooper, K., Sharon, A., 2001. Strategic management of complex projects: a case study using system dynamics. System Dynamics Review 17 (3), 237–260.
Miskawi, Z., 1989. An S-curve equation for project control. ConstructionManagement and Economics 7 (2), 115–124.
Morris, P., 1994. The Management of Projects. Thomas Telford, London.
Nobeoka, K., Cusumano, M.A., 1995. Multi-project strategy, design transfer, and project performance: a survey of automobile development projects in the US and Japan. IEEE Transactions on Engineering Management 42 (4), 397–409.
Pavlak, A., 2004. Project troubleshooting: tiger teams for reactive risk management. Project Management Journal 35 (4), 5–14.
Pennypacker, J.S., Dye, L.D., 2002. Project Portfolio Management and Managing Multiple Projects: Two Sides of the Same Coin? CRC Press.
Pidd, M., 2003. Tools for Thinking: Modelling in Management Science. John Wiley & Sons, Chichester.
Repenning, N.P., 2001. Understanding fire fighting in new product development. Journal of Product Innovation Management 18, 285–300.
Roberts, E.B., 1974. A simple model of R&D project dynamics. In: Robert, E.B. (Ed.), Managerial Applications of System Dynamics. Productivity Press, Cambridge, MA, pp. 293–314.
Rosen, C., 2008. The myth of multitasking. The New Atlantis 105–110 Spring.
Rosenau, M.D., 1988. Faster new product development. Journal of Product Innovation Management 6, 150–163.
Söderlund, J., 2004. On the broadening scope of the research on projects: a review and a model for analysis. International Journal of Project Management 22, 655–667.
Sterman, J.D., 1994. Learning in and about complex systems. System Dynamics Review 10 (2–3), 291–330.
Sterman, J., 2000. Business Dynamics: Systems Thinking and Modeling for a Complex World. Irwin McGraw-Hill, Boston.
The Economist, 2010. FromHoarding to Hiring. Some CountriesHave Successfully Preserved Jobs. Now TheyMust Create New Ones. The Economist. October 7.
Thomas, J., 2002. Case History: International Truck and Engine Corporation Developing a High Performance Truck: “Dos and Don'ts” of Product Development in a Traditional Industry. Visions. April/May.
Tsubakitani, S., Deckro, R.F., 1990. A heuristic for multi-project scheduling with limited resources in the housing industry. European Journal of Operational Research 49 (1), 80–91.
Ward, A., Liker, J.K., Cristiano, J.J., Sobek II, D.K., 1995. The second Toyota paradox: how delaying decisions can make better cars faster. Sloan Management Review 36 (3), 43–61.
Wheelwright, S., Clark, K., 1992. Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality. Free Press, New York.
Wiley, V.D., Deckro, R.F., Jackson, J.A., 1998. Optimization analysis fordesign and planning of multi-project programs. European Journal of Operational Research 107 (2), 492–506.
Yaghootkar, K. 2010. Causes and Effects of Schedule Pressure in New Product Development Multi-project Environments: An Empirical and System Dynamics Study of Product Development in a Truck Manufacturer. Thesis submitted to The University of Manchester for the degree of Doctor of Philosophy.
DOI: http://dx.doi.org/10.52155/ijpsat.v4.2.81
Refbacks
- There are currently no refbacks.
Copyright (c) 2016 Chaitanya Geetha Krishna Nama
This work is licensed under a Creative Commons Attribution 4.0 International License.